The following work measurement systems mentioned below are recommended:- MOST Work Measurement This technique provides the most accurate and economical analysis of man-machine operation in today's semi-automatic and fully-automatic operations. MOST analysis is far more superior than any known system and helps organizations (manufacturing, engineering, and services) develop streamlined processes through design in work methods and time optimization. MTM (Methods Time Measurement) MTM lays the foundation for motion and time study and provides a very detailed breakdown of the work methods for facilitating methods engineering of work methods design, workplace layout design, machine tool design,jigs, fixtures and container design. Standard Data Blocks This approach requires the training of your own
personnel to sample work activities from established work
categories and apply either our MOST, MTM or
Time Study Technique to collect process data. |